Description:

The project consists of construction of asphalt overlay on 23.995 miles on eight existing asphalt roads throughout Bolivar County. Asphalt base repair, asphalt overlay, and concrete curb & gutter removal and replacement throughout Eastgate Subdivision, the roadbed reclamation of 2.55 miles of existing asphalt on Rosemary Road, and the reconstruction and asphalt overlay of 4.07 miles of existing asphalt on Township Road, 0.45 miles of existing asphalt on Peavine Road, and 1.11 miles of existing asphalt on Prewitt Road.


Funding Source: ARPA Funds, Bolivar County

Cost: $11,828.240.00

Completed: 2023

Details:

Surveying

Material Testing

Design

Construction Inspection

Construction Stakeout